Last Days of the Big Four

Standard

Back in the immediate post second world war period, the railways had been “nationalised’ for the duration of the war, and following the election of Clement Attlee’s Labour Government, they were keen to return to the pre 1939 arrangements.  The new government were clear that they were going to bring all of the LMS, LNER, GWR and Southern under a single umbrella, as a truly nationalised industry.  A national rail network and operating as a single entity.

The call for nationalisation went back to at least 30 years earlier, with the Geddes Report, and David Lloyd George – when Prime Minister in 1918 – told a TUC deputation at a Select Committee that he was “in complete sympathy” with the projects for railway and canal; nationalisation.  29 years later, one MP quoted the English philosopher John Stuart Mill in a debate:

Countries, which at a given moment are not masters of their transport, will be condemned to ruin in the economic struggles of the future.”

It seems the railway companies in the 1940s were not “in complete sympathy” with either Lloyd George or John Stuart Mill.  Mill’s maxim is as valid in 2022 as it was in 1947.

But …. Unsurprisingly, the shareholders and ‘investors’ in the previous separate businesses were going to publish an alternative view, where they would claim the ‘Big Four’ had plans for investment and development at all levels.  There are some examples that could rightly lay claim to being developed by the private companies – the early diesel, electric, and gas turbine locomotives.  At least in terms of main line locomotives these were more a case of the British companies playing catch up with railway systems elsewhere in the world.

Britain’s main source of fuel and energy was the huge coal resources that were still being mined, and the non-steam development was always going to be a difficult project, and even where oil burning was tried on steam traction, it was not a success.

The Big Four were clear about their opposition to nationalisation, and claimed in their publicity material, such as the booklet produced in 1946, that they had great plans, as well as laying claim to some dubious successes of the 1930s. 

Typical of their claims were these two statements:

The inter-war period was not an economic period they should have looked at to suggest some of their ‘developments’, characterised as it was by the ‘Great Depression’.  Many of the UK’s world-famous engineering companies were close to going bankrupt during this period, and examples such as the North British Loco Co survived by the skin of their teeth. 

The railway companies claimed that they had achieved this work during the period from 1928 to 1938 – it may be argued that some of it was achieved, but then the booklet was designed for marketing and a ploy to dissuade the supporters of nationalisation.

The world was changing rapidly, and the manufacturers and suppliers, as well as the railways were faced with major change.

These changes might not be so easily met by reverting to pre-war management and supply chain practices, and the haphazard developments in motive power and rolling stock.  The ‘Big Four’ were adamant that they were best placed to take the separate railway companies forward and provide the technological and operational developments needed.

They concluded the booklet with this statement:

But there were those in parliament who offered their different views, including those of railwaymen like Walter Monslow:

The full booklet can be downloaded here:

oOo-

Northwest Steam Spot – The Crimson Ramblers

Standard

Preserved MR Compound No. 1000 piloting “Jubilee” “Leander” on a Cumbrian coast special to Sellafield, on the May Day Bank Holiday in 1980, passing Dalton Junction, to use the Barrow-in-Furness avoiding line.  Photo: Rodger Bradley

In 1948, there were still 40 of the original Midland Railway 3-cylinder compound locomotive design in service, but only one in the Northwest No. 41005 at Lancaster, with the reminder on the London Midland Region’s Midland lines. Of the LMS built engines, there were 69 at Northwest depots in 1950, and out of the total of 223 compounds in B.R. service, 161, or 72% were in London Midland stock. 62 locos. were at work in the Scottish Region, mostly in and around Carstairs, Ayr and Corkerhill, along with Carlisle Kingmoor.

One of the original Midland built compounds, seen here in early LMS livery, and by British Railways days, the engine was at Chester until its withdrawal.  Photo: Frank Dean/RPB Collection

Compound locomotives have not had a particularly happy history on Britain’s railways, but the design based on the Johnson-Smith-Deeley system were more successful than most. the first five locomotives were outshopped with only Saturated boilers from Derby Works in 1902/3, and even following Richard Deeley’s appointment in 1903, as CMEM of the Midland Rly., the compounds continued to be built in unsuperheated form. The original Midland engines were numbered 1000 – 1044, and from 1924 – 1927, and in 1932 (with some modifications), a further 195 were built as the standard express passenger power for the LMS.  These locos were numbered 900 – 939, and 1045 – 1199.

Although all 235 locos. were classed as 4P, there were significant mechanical differences that might logically have provided two classes. The basic layout involved two 21″ diameter low pressure cylinders, outside the frames, and a single 19″ diameter high pressure cylinder between, operated by Stephenson valve gear. The boiler was pressed to 200lbs/sq in, and in later Fowler built engines, a Schmidt type superheater was fitted. The original MR locomotives had 7’0″ coupled wheels, whilst the majority, and later LMS standard engines, were only 6’9″ diameter. This in turn, caused an increase in tractive effort from 21,840 lbs to 22,630 lbs, calculated at 80% of boiler pressure in the low-pressure cylinders.

Amongst the characteristic detail features of the compounds, more especially the LMS built locos perhaps, and rebuilds of the first Midland engines, included the straight sided Belpaire topped firebox, and cylindrical smokebox, with door fastened by six clamping dogs. The steam brakes operating cylinders were placed between the coupled wheels, and acted directly on the inner shoes, with a mechanical linkage to the outer shoes, giving a clasp type application of braking force. This was feature of the original series retained in later builds, with the operating arrangement of clasp type rigging used on most modern diesel and electric types.

The most obvious feature was of course the outside cylinders, with a long piston tail rod passing through the front end cover, over the leading bogie wheels. A curious feature of the cylinder layout, perhaps, was the use of slide valves to admit steam from the low pressure receiver to the low pressure cylinders, with a piston valve controlling the admission of high pressure steam to the high pressure cylinder steam chest.  A feature of the early locos. which was not continued, was the use of bogie brakes, and the rigging was removed from the engines it was originally attached to; an unnecessary complication tried on several loco. designs in the early years of the 20th Century.

Apart from the style of the chimney, dome and double buffer beam at the front end, typical Midland design was adopted in the construction of the cab, and straight sided six-wheeled tender. This was a Fowler design, based on Midland practice, carrying 3,500 gallons of water, 6 tons of coal, and provided with water pick-up gear.

A major difference between the LMS and Midland engines being that the original locos. were right hand drive GWR style! – the changeover to more conventional left hand drive was made on the 1924 series built by the LMS. With the exception of the coupled wheel diameter, all major external dimensions between the two versions were identical.

In British Railways days, the largest allocation of compounds in the Northwest was at Chester, where, in 1950, 13 were stabled, whilst Llandudno Jct. with 10 engines, was a close second. No less than 15 Northwest depots shared these 70 compounds, with the majority on the Manchester to Crewe, and Chester to Holyhead lines. The only representative of the original Midland Railway design was stabled at Lancaster, as B.R. No. 41005, and has some interesting points in its operational history. It was the first of the batch built by Richard Deeley, which covered locos. 41005 – 41044 and was rebuilt by Henry Fowler in 1932 with a superheated boiler, Ross ‘pop’ safety valves, and a typical Fowler steam dome which had a slightly flattened top.

One of Crewe North’s allocation seen here in early LMS days, was No. 1115, later renumbered 41115.  By 1954, the engine had been moved to Holyhead. 
Photo: Andy Dingley (scanner) – Scan from Allen, Cecil J. (1928) The Steel Highway, London: Longmans, Green & Co., pp. facing page. (II) 64, Public Domain, https://commons.wikimedia.org/w/index.php?curid=10650082

By the mid 1950s, withdrawals had reduced the number of compounds in service to 56 (1954), out of a total on the London Midland Region of 131, just less than 43% of the total operating stock. However, by the end of the 50s, they had almost completely disappeared, with only 18 left at the beginning of 1959, and none of these was from the original Midland Railway build. Of course, by that time 41000 had been preserved at the Clapham Museum as No.1000, in fully lined LMS crimson lake livery.

Speaking of this, it remains a curious fact that although classified as a passenger type, they never appeared in British Railways lined green, which could have been an attractive scheme.

Instead, like some of the passenger tanks, and the ‘Black Fives’, they appeared in mixed traffic lined black colours, with the early British Railways lion and wheel emblem/totem in the middle of the tender sides.  As far as I know, none of the compounds received the later style of crest, which appeared from 1956 onwards.

Allocations

Notes

No allocations for 1964, since no compounds were then in service. Of the 75 remaining on the London Midland Region in 1954, almost one third were at work in the Birmingham area, with the remainder on the St Pancras to Manchester line, and a few in and around Leeds.

oOo-

NORTH WEST STEAM SPOT – “FOWLER CLASS 4 Passenger TANKS”

Standard

If there was such an animal as a typical Midland locomotive, then surely Henry Fowler’s class 4 passenger tanks were in that category. First built at Derby Works from1927, many of the class came to the northwest, in BR days particularly, although it was not until the early 1960s that there were ever more than half the total allocated to this area.  

NB: The heading image shows Banks Station, with the 17.59 from Preston, headed by LMS Fowler 2-6-4T No. 42369. This is a classic Fowler working on this Preston – Southport train, looking eastwards, towards Preston. The line and station was closed on 7/9/64 – less than two weeks after this photograph.

Photo: Ben Brooksbank, CC BY-SA 2.0, https://commons.wikimedia.org/w/index.php?curid=12385024

Leading Dimensions

They were intended for heavy suburban and intermediate passenger work, and classified 4P, with steam pipes inside the smokebox on the original 1927 build. Modifications introduced in 1930 included outside steam pipes, side windows in the cab, and an altered smokebox saddle, with a solid bottom to the cylindrical wrapper. 

This latter, with outside steam pipes, was essentially adopted to eliminate a. corrosion problem, where the steam pipes had passed through the bottom of the smokebox and saddle. 

No. 42368 (built 1929, withdrawn 6/65) at Derby Locomotive Depot, shown here in the Locomotive Yard, with the Station visible in the left distance, clearly fresh from repair at the Works, and in almost pristine condition. This loco was later transferred to Gorton, where it would finish its days.
Photo: Ben Brooksbank, CC BY-SA 2.0, https://commons.wikimedia.org/w/index.php?curid=18547307

In general, the modified locos. were the same as the earlier version and covered by diagram ED172C.  The parallel boiler was retained, supplying two outside cylinders, operated by Walschaerts valve gear, with long travel inside admission piston valves.  Other minor modifications included the provision of’ cast steel axleboxes, compared with the earlier, manganese bronze variety. The original cab and gangway door arrangement contributed to the draughty nature of the footplate, and the large gap behind was partially closed, and some locos. were fitted with folding doors. In early BR days, a number of engines we refitted with new, cast steel cylinders.

Operationally, the  class was a success from the word go, and have been reported by some sources as “excellent performers”.They were more economic to run than the later Stanier designs, on faster, heavier and more demanding duties. On building they were allocated numbers previously carried by a variety of, pre-grouping types, including North Staffordshire and Midland Railway 0-6-0s. In the north west they were assigned to duties originally undertaken by the Hughes, ex L & Y, Baltic tanks, where they proved highly successful. There were though, some curious differences in mileages run between general repairs. The engines allocated to Scotland for instance, were able to work 240,774 miles between repairs, whilst in England the figure was only slightly more than half this. 

In service with British Railways, the locos. were reclassified as mixed traffic, with just less than half allocated to northwest depots.  Of these, the majority were stabled in South Lancashire, North Cheshire and Derbyshire.  The engines sent to Oxenholme and Tebay were mainly for banking assistance on the climb to Shap, whilst the Furness line’s passenger duties were very largely powered by these class 4 tanks. By the mid 1950s, Buxton, Alsager and Tebay had lost their stock, though they could still be seen in some strength in the Potteries, North Cheshire and around Manchester.  Macclesfield for example had maintained a stud of 11 Fowler class 4’s for many years, but by the early 1960s they had been withdrawn.

No. 42376 (built 1932, withdrawn 11/62) at Lakeside, Windermere station in 1951 with a train for Ulverston. The loco was allocated to Stoke in 1950, but would have been reallocated to Barrow when this photo was taken.
Photo: Walter Dendy, deceased, CC BY-SA 2.0, https://commons.wikimedia.org/w/index.php?curid=61421464
Another of Walter Dendy’s images captures No. 42301 (built 1927, withdrawn 10/63) at Windermere, on the Oxenholme-Kendal-Windermere branch off the West Coast Main Line. This 1951 view towards buffer-stops, captures the loco with a train for Morecambe.
Photo: Walter Dendy, deceased, CC BY-SA 2.0, https://commons.wikimedia.org/w/index.php?curid=61368688

The class total too, was dramatically reduced at this time from 125 to a mere 16 in 1964, and were completely extinct soon after. 

The livery carried in British Railways days was mixed traffic black, lined red, cream and grey, with at one time or another, both designs of lion and wheel symbol being applied to the side tanks. They were, in this guise, a very attractive engine – what a pity only the Stanier and Fairburn types are represented in preservation. 

Allocations

1950

1954

1964

Class totals;

  • 1950 = 125, with 62 or 49.6% at northwest depots. 
  • 1954 = 125, with 53 or 42.4%at northwest depots. 
  • 1964 = 16,  with 12 or 75.0% at northwest depots. 

Further reading & Useful Links

  • LMS Locomotive Profiles No. 3: The Parallel Boiler 2-6-4 Tank Engines” – David Hunt, Bob Essery Fred James (2002) ISBN1-874103-72-0
  • “Engines of the LMS built 1923–51” – Rowledge, J.W.P. (1975).  Oxford: Oxford Publishing Company. ISBN0902888595.

The LMS Patriot Project and a NEW Build Fowler 2-6-4T

-oOo-

Springboks & Bongos – Part 2

Standard

The Thompson era on the LNER was in sharp contrast to the previous twenty years, under the guiding hand of Sir Nigel Gresley.  During Gresley’s day there were a number of notable designs, and the locomotive stock was represented by a large number of different types, often designed for specific purposes, produced in response to current business and commercial demands.  Gresley’s designs could almost be described as bespoke, or niche products, aimed at satisfying an immediate business need, and not providing a standard range, or designing motive power which could be used on a wide variety of services. 


Another of the pre-nationalisation built B1’s, in this case, North British built 61056, works No. 25812, delivered in July 1946, at speed on a special in the early 1950s.  This loco was an Ipswich engine in 1950, but by April 1964, had been withdrawn for scrapping.
  Photo; Roger Shenton / RPB Collection

The business of running a railway and providing commercial transport services had begun to change dramatically when Edward Thompson took charge, and of course, the demands of the Second World War denied Thompson the luxuries (in locomotive design terms) of the Gresley years.  The business was demanding more efficient services, reducing costs – a recurring theme – and simplicity in the locomotive department. 

After the initial trial running carried out under LNER ownership, when the design was new, the next major test for the B1s came in 1948, just after nationalisation, and the Interchange Trials began.  Some interesting conclusions were drawn on the results of these trials, such as the fact that the B1 appeared to be more economical on the former Midland lines, and the Black Five fared better on the Great Central route!! 

Later still, in 1951, a series of trials took place over the Carlisle to Settle route, and B1 Class 4-6-0 No. 61353 formed the subject of intensive trials between 1949 and 1951, along with static tests at the Rugby Test Plant. The B1 performed well, and overall, the tests seemed to indicate a good well-balanced design, with a free steaming boiler, and a locomotive that was economic and efficient at the tasks it was set. 

In the end it was the arrival of BR Standard classes and diesel traction that signed the death knell for the class.

Click on the link below to read on …..

Early Main Line Diesel Locomotives of British Railways

Standard

Diesel traction was pioneered in Britain by the LMSR in the 1930s, with a variety of shunting locomotive types, and by the late 1940s steps had been taken towards the arrival of the first diesel locomotive intended for main line workUnder the guidance of the LMSR’s C.M.E., H.G.Ivatt, and the co-operation of English Electric Ltd.,1600hp diesel-electric No.10.000 took to the rails in December 1947. 

Here was the first of an entirely new breed – the 16-cylinder English Electric diesel engine operating a generator, supplying power to the six electric motors driving the road wheels of the two bogies.  English Electric had long been involved with non-steam design and build, mostly for overseas railways, and were at the forefront of most development and innovation around the world. 

The use of traction motor/gear drives had already replaced the jackshaft/side rod drives of the pioneer shunters, but No.10,000 was its ultimate development on the LMS.  Diesel power was also the first step towards the elimination of steam locomotives as the principal source of main line motive power. But nobody looked at it that way then; it was the train of the future, something for small boys to marvel at on station platforms. 

These first main line diesel types were perhaps considered along the lines of proposed ‘atomic trains’, a far-off concept in the post-war era.  Strangely enough, by the time BR came to embark on its dieselisation programme, diesel locomotives had become smelly tin boxes on wheels, and the seeds of steam nostalgia were sown.  It’s doubtful that steam era footplatemen were anything other than happy with improved conditions.

So much for the train of the future!

Click on the image below for more information on the ex-LMS projects on British Railways:

The Southern Railway too was progressing with main line diesel traction in the post-war era, but it was not to be for a further three years after nationalisation that their locomotive appeared.  Meanwhile the GWR had decided as usual to pursue an independent course, with plans for gas turbine types, although these too would not be completed until 1950.

This cartoon appeared in the April 1948 issue of the railway’s “Carry On” magazine, and reflected the new technology, and its need for heavy fuel oil to power the locomotive, and not coal.

-oOo-

British Railways First Locomotive Liveries

Standard

Following nationalisation, new and repainted locomotives continued to appear in traffic bearing the initials of their former owners, though replaced very quickly by a complete absence of any titling. This early period saw also a number of new engines built to the designs of their former owners, outshopped with their original works/builders’ plates fitted, but with the tell tale signs of having had the initials LNER, LMS, &c., removed before the locomotive went into traffic. The appearance of evidence of former ownership was very long lasting in some cases, with ‘sightings’ of a faded ‘GWR’, or ‘LMS’ being noted in the contemporary railway press of the late 1950s.

252 - Lens of Sutton - West Country at Waterloo

Bulleid “West Country” pacific at Waterloo still in ex-Southern Railway colours, sporting its new 1949 BR number – but still carrying the 1948 ‘British Railways’ on the tender sides. Photo: Lens of Sutton

The full title BRITISH RAILWAYS was carried by many locomotives and numerous classes, lasting, at least officially, until the arrival in 1949 of the lion and wheel emblem, or totem as it was known.  The style of lettering adopted officially in 1949 was Gill-Sans, and had been widely used on the London Midland, Eastern, North Eastern, Scottish, and Southern Regions of BR, from 1948, although the Western Region perpetuated for a time the style of the old GWR, and some examples of former SR style on the newly formed Southern Region could also be found.

An exhibition of experimental colour schemes was held at Addison Road station in January 1948 involving a number of newly built LMR Class 5MT 4-6-0s (See Table). The first locomotive turned out with any indication of its new ownership was the WR 4-6-0 No.4946 Moseley Hall repainted in full GWR livery, but with the tender lettered BRITISH RAILWAYS using the old GWR style letters.

LMR Class 5 LiveriesOf course, it was not just locomotives that were exhibited at Addison Road, rolling stock too was displayed, with a selection of new colours, covering express passenger, suburban, and the few multiple unit types around at that time. During the first six months of 1948, the Railway Executive was concentrating equally as hard on the new image of British Railways, as with homogenising the administrative and operating procedures of the former owners.

Officially, the six regions of British Railways were colour coded from 1st May 1948, and the colours applied across most of the range of railway activity, from posters and timetables to station nameboards.

But, locomotives and rolling stock were excluded from this level of uniformity.

BR Regional colours 1948

The BTC published a series of Temporary Painting Schedules for its inhgerited motive power in late 1948 covering these experimental liveries:

1949 Liveries Table

Some of the first applications of the experimental locomotive colours were combined with similarly repainted rolling stock, and no less than 14 trains were dispatched over various routes around the country, and the public invited to comment on the new schemes. To what extent the public responded to the request is not known, and sadly, no official records of the ‘experimental’ colours now exist, other than the temporary painting schedules.The shades displayed by the locomotives came in for much retrospective comment, often incorrectly.

1949 Loco Liveries

BR’s first standard locomotive liveries, adopted from 1949 onwards. Later regional variations included some interesting changes for the Class8P passenger types in particular.

The 1948 trials brought LMS Class 5s, and GWR Kings and Castles in lined light green and lined blue, with incorrect suggestions that two different blues were used.  The appearance of the experimental colours was directly affected by the materials used. With both oleo resinous and synthetic paints applied, the latter as an alternative for the green and lined black styles, there would be perhaps appear to be differences in the colours themselves.

A4 Sir Charles Newton at York in 1950

Grelsey’s A4s certainly suited that express passenger blue – here 60005 “Sir Charles Newton” is captured at York in 1950.           Photographer unknown.

Painting of locomotives could be divided into two principal stages: Preparatory Work and Finishing Processes.

Preparatory work on complete repaints comprised a number of operations: first, a coat of primer was applied, followed by whatever stopping and filling was necessary, whilst the intermediate operations were a combination of rubbing down and undercoating. Lastly, a single coat of grey undercoat was applied, prior to the finishing processes.

The Finishing Processes took no less than three days, on the first day a single coat of sealer/undercoat was applied in the livery colour, followed by a coat of enamel/finishing paint was laid down. The second day was occupied with lining and lettering, and finally, on the third day, a coat of protective varnish was applied.

The fact that two shades of blue have been reported as ‘sightings’ in the contemporary enthusiast press could be attributed to the difference between oil based and synthetic resin paints, with the addition of extra pale varnish, or equally to the effects of cleaning. However, there was only one shade of blue, in both the experimental and early standard liveries.

GW Sharpe COLLECTION-4

Jubilee Class 45575 “Bahamas” immaculately turned out in the standard BR lined green livery for express passenger types, sporting the 1949 ‘totem’, and shedplate for Kentish Town.     Photo: (c) G.W.Sharpe

Cab and side panelsLettering and numbering was also subject to variation and initially, this was affected by the regional management, and resulted for a time in the use of serif and non-serif characters, depending on whether Swindon, Brighton, or Crewe were completing the repaints. Plain white letters was the official order of the day for London Midland, whilst Swindon, independent to the last – and some would say beyond – offered its own elaborate style. But, in September 1948, the Railway Executive announced its standard instructions, whereby all letters and figures were to be in Gill Sans Medium normally be applied in gold or golden yellow, and where the outline was other than black, these letters and numbers were to be outlined in black. The statement went on to advocate not a standard size of engine cabside number, but the use of the largest possible figures that would fit in the available space.

And these were just the first steps in achieving what today would be described as the “brand image”, with the final decisions taking into account – to some degree – regional practices. The lion and wheel emblem (icon, logo or totem) was the brand that featured strongly in the years up to 1956, when it was replaced with a genuine heraldic ‘device’. Sadly, there are too few colour images of the locos carrying the early experimental liveries, and aside from the decision not to use blue for express passenger types, the 1949 standard colours were retained until the end of steam. (Yes, I well remember seeing an ex LMSR “Coronation” class pacific running through Preston in the late 1950s, but it was an exception).

RPB COLLECTION3-39

Castle Class 4-6-0 – probably 5079 “Lysander” on “The Cornishman” around 1950, complete with red & cream coaches. 5079 was previously converted to oil-burning in the late 1940s, but here seen back as a coal burner. Sadly not in colour, but it would be in standard lined green livery.             Photo: Lens of Sutton

Then from the late 1950s onwards, as diesel traction began to make its progress felt and heard, green became a favourite colour choice, and there were not a few variations there too.  The totem or logo changed in the mid 1950s too, and although often described as a crest, it was only the 1956 lion holding wheel crest was a proper heraldic device.  See “British Railways Locomotive Crests” for more details.

The liveries and styles carried by British Railways motive power in the steam era were very much suited to the motive power of the day, and provided that essential unification – and ‘brand image’ – that the nationalised railway network demanded.

To be continued …… 

-oOo-

CLASS 47 – ALMOST 60

Standard

In 2022, BR’s most common – take that whichever way you like – diesel locomotive that started life in 1962, as the first of the 2nd generation of main line diesel-electric locomotives.  It came at a time when there was certainly competition between Britain’s locomotive manufacturers, and a fair degree of collaboration and partnership within the railway industry.  There was a considerable degree of collaboration between the private/commercial sector and the BR workshops, which only declined in the 1980s, until it almost completely disappeared by the turn of the century.

668 - Class 47 No. 47144 at Barrow - 1730

27th August 1979, and Class 47 No. 47144 leaves Barrow-in-Furness, with the 17:30, bound for London Eueston.  (c) RPB Collection

So, the Class 47 – which to be precise, was announced in the railway press as a new, highly innovative design from Hawker Siddeley – who had only recently become owners of Brush Traction Ltd and Brush Electrical machines.

Falcon1a

Brush’s prototype “Falcon” was the model for the Brush Type 4, but with a completely different power plant.

The most widely used, most well known, longest surviving, successful – just some of the words you might use to describe the Brush Traction design ordered by British Railways in the early 1960s. Successful was not at one time a word you would have used to describe this locomotive – a bulk order, rushed through as BR’s debts were climbing, and the ‘Pilot Scheme’ diesels were still “on trial”. Brush too, was perhaps an unlikely choice as supplier, since the company did not have the same pedigree as English Electric, AEI, Birmingham RC&W Co., or Metropolitan-Vickers in the railway field. But, as Dylan said, the times they were “a-changin”.

The PDF file below, is not intended to be a fully detailed account, there are several other, very well written books and articles that cover the individual locomotives, and its design and operational history in detail.

1052 - Unidentified Class 47 Co-Co diesel on oil train at Hathersage 1975

An unidentified 47 at speed on a train of oil tanks approaching Hathersage in 1975.                  Photo: Dave Larkin

 

Perhaps this will whet your appetite to study further – just click on the image below:

Class 47 Cover

IMG_0040

47826 in InterCity livery, but playing tail end Charlie to the restored BR Standard Class 8P “Duke of Gloucester”, which has just entered the tunnel at the west end of Dalton-in-Furness station in March 2007. © RPBradley Collection

Useful Links & Further Reading

 

 

Non-Standard Shunters of BR – Part III

Standard

To complete this little anthology, it seemed appropriate to include the least well known, and some pretty obscure examples of low-powered locomotives used on British Railways – many at small yards and depots, and dockyards.  Many locos of the sizes described here were adapted, or used for large industrial, engineering, quarries and mining operations, whilst one example remains unique from a major British manufacturer – Brush Traction.

Blue Box8 7

Ruston & Hornsby and its predecessors have a key place in the development of diesel traction, with the East Anglian company boasting one Richard Akroyd – a contemporary of Rudolf Diesel amongst its number. However, Ruston & Hornsby’s contributions to British Rail never fully extended beyond the shunting and service locomotive stock. PWM650 is seen here sporting the earliest BR livery style – used on running department stock too. This example was the first to appear in 1953 and, in common with the Brush design, an electric motor provided the drive to the wheels.                    (c) Lens of Sutton

This final selection of builders provided the least number of diesel shunters to BR in the 1950s and early 1960s, but a number of these have survived – including examples of the Rolls Royce powered shunters from Yorkshire Engine Co. Brush Traction on the other hand supplied only one diesel-electric prototype, which has long since disappeared, whilst many of the departmental varieties, included samples from John Fowler, Hibberd and even an aeroplane manufacturer from Bristol. Some of these were curious shunting types indeed for a nationalised railway, but were nonetheless an essential part of the organisation, whether on standard or narrow gauge tracks.

Clink on the image below to read on: 

Non-Std Part 3 Cover

 

Useful Links & References:

 

NON-STANDARD DIESEL SHUNTERS OF BRITISH RAILWAYS

Standard

British Railways standard diesel shunter was the English Electric designed 0-6-0, with almost any number of variations of the ‘K’ series engine of 1930s vintage.  This was developed from the 1930s designs used on the LMS, and was the mainstay of goods, and train marshalling yard operations – it seemed almost forever.

However, in 1962 there were no fewer than 666 diesel shunting locomotives in operation on BR, of either 0-4-0 or 0-6-0 wheel arrangement and powered by engines of less than 350 hp.  These “non-standard” types performed a variety of the most mundane tasks, and their earliest appearance was from a pre-nationalisation order to the Hunslet Engine Co. of Leeds, also by the LMS.  Following the end of the Second World War, many more were ordered from various makers.

RPBRLY-3

Captured at Bo’Ness on the Bo’Ness & Kinneil Railway in the 1990s, by then Class 03 073 in its final ‘Rail Blue’ livery, this was one of the Drewry built 0-6-0s, with the ‘Flowerpot’ chimney.     (c) Rodger P. Bradley Collection

By the early 1980s there were only a handful left in service, mainly of the Class 03 0-6-0s built at Swindon, together with samples from Andrew Barclay, Ruston & Hornsby, Hunslet, Drewry Car Co., Hudswell-Clarke, etc.

During BR days, a motley collection of some 11 different designs were in service, carrying out shunting and many other light duties at yards the length and breadth of the country. Although some of the designs dated from the 1930s, the majority were constructed after 1948.

The particular types reviewed here were built at Swindon Works, Drewry/Vulcan Foundry, Hunslet and Hudswell-Clarke.  Each featured either a 204hp or 153hp Gardner diesel engine, and various forms of mechanical transmission.

Click on the image below to read on..

PDF Cover imageUseful Links & References

 

 

 

 

Diamonds Were Forever

Standard

The Great Western Railway had, since its inception been the loner amongst the rai1ways of this country. Beginning with its adoption of Brunel’s broad gauge in the early nineteenth century, this tradition of individuality was carried on beyond the nationalisation of the railways in 1948 to the introduction on the Western Region ten years later of he first main-line diesel hydraulic locomotives. Ostensibly the idea was to assess the relative merits and demerits of the hydraulic transmission as compared with the electric variety. The diesel types with hydraulic transmission were restricted entirely to the Western Region; perhaps the ghost of Brunel and his advocates had something to do with this! Nevertheless, with the implementation of the National Traction Plan in 1967, the D600 class “Warships” days were numbered. But they deserve their place in the story of diesel traction on Britain’s railways, marking as they do, a milestone in the history of motive power development in this country.

D600 on test run - no number

Brand new, straight out of the box – an unnumbered “Warship” on a proving run from the North British Loco Co works.

Five locomotives of this type were ordered from the North British Locomotive Company in November 1955, eventually to become Western Region “Warships” numbers D600 to D604. These locomotives were built under the pilot scheme of the British Transport Commission’s Modernisation and Re-equipment programme for the rai1ways. It was proposed under this scheme to introduce specific types of diesel locomotives in four broad power groups, and to subject them to a period of intensive trials in order to evaluate the advantages and disadvantages of each type.

This was, however, not to be, and shortly after the programme was launched a re-appraisal was carried out, following which, bulk orders were placed with contractors, in many cases hardly even before the first of the prototypes were outshopped. Some of these proved their worth, but not until after much re-work of major components, including for the many engines fitted to the Brush-Sulzer Type 4 locomotives was undertaken.

Back to the Pilot Scheme orders, the North British Company delivered the first locomotive of the D600 class in 1958.  These “Warship” class locomotives were powered by Anglo-German engines – two N.B.L./M.A.N. L12V 18/21S to be precise – each with a continuous output rating of 1000hp, at an engine speed of 1445 rpm. This placed the design in the category of locomotives with high-speed engines – another area for comparison and trials under the Pilot scheme – with many others sporting medium speed engines.

They were carried in a full width body over two three-axle bogies, and the central axle of each bogie was ‘free, with the engines driving the axles through a Voith/North British L306R hydraulic transmission. This was denoted as the A1A-A1A wheel arrangement, which could to a degree be seen as a disadvantage when it came to getting sufficient power to the wheels to start and haul a train.

When I first penned this article, I wrote:

“Contrary to popular opinion, diesel locomotives are not merely tin boxes on wheels, belching forth voluminous clouds of noxious fumes; these locomotives even had mainframes!”

The mainframe part of that comment was clearly true, but with the benefit of hindsight, the “clouds of noxious fumes” was a bit much. But this was at a time when you could see the pollution of steam trains, but we were yet to become more aware of the hidden dangers of the diesel exhaust.

D600 diagramStructural Details

The underframe was built up from mild steel plate and sections, covered with steel plate forming a continuous floor. The double plate frame 
bogies were fabricated from 7/16 in. thick plates, with cross-stretchers
and headstocks riveted to the side members. Double swing link bolsters provided support for the weight of the whole of the locomotive and
its contents. These were in turn fitted with four bearing pads on each bogie, with the final drive gear train, and wheels and axles fitted with “Timken” roller bearing axleboxes with a wheelbase of 15ft equally divided. The driven wheels were 3ft.7ins. in diameter, whilst the centre pair were 3ft. 3 ½ ins.

Dimensions

At least one item that stands out in the list of particulars given is the weight of the locomotive.

At over 117 tons, these were really heavy machines, especially when compared with designs that appeared less than a decade later, and typically delivered around 2800 h p, for less than 100 tons of locomotive. This power-weight challenge faced by the first “Warships” stands out even more when compared with the D800 series of Locomotives, which for the same power weighed a mere
 78 tons. Nearly 40 tons less! The D600’ s were certainly very solidly bui1t!

D600 NBL-MAN Engine

The NBL/MAN V12 engine on a stand, waiting to be installed in the locomotive. One of the earliest high-speed diesels, but it did prove to be less reliable in service than hoped, and BR had adopted medium speed designs for the majority of locomotives.

Theory has it (or possibly had it, theories may have changed!) that the less
 of its own weight a locomotive has to haul, the greater the weight of the train that can be hauled, for the same engine power. With a power/weight ratio of 17.1 hp/ton this certainly compares unfavourably with the D800 series, which for the same power had a power/weight ratio of slightly more than
 25.6 hp/ton. A further comparison with the most recent freight locomotives in use on Britain’s rail network – the Class 70 – shows that they have a power to weight ratio of over 29hp/ton.

The pressure charged NBL/MAN 12 cylinder ‘vee’ engines were flexibly mounted on fabricated steel section underframes, which was intended to mitigate stress placed on the engine from shock loading under accelerating and braking conditions. The engine crankcase and cylinder blocks were built up from steel plate, the former incorporating cast steel bulkheads carrying the main bearing housings, the crankshafts being hardened and ground alloy steel forgings.

D600 bogie

A bogie being assembled in the works of the North British Loco Co

The hydraulic transmission installed by Voith/NBL included three separate torque converters, each of which was designed to cover three separate speed ranges, with each one arranged to take over at the appropriate road speed automatically.  The final drive to the outer axles on each bogie was completed through a pair of Hardy Spicer cardan shafts.

Braking equipment was provided by Westinghouse air brakes for the locomotive, with four brake cylinders (10ins x 8ins) on each bogie operating clasp brakes to each wheel. A separate air brake handle was provided, which operated the locomotive brakes only, whilst a proportional valve ensured that application of the train vacuum brake gave a proportionate application of the locomotive’s air brake.

Also noted in the list of particulars is a water tank having a capacity for 1000 gallons of water. The reason for this was that since the locomotive were introduced at a time when only steam heating of locomotive hauled stock was available, all diesel Locomotives designed under the modernisation plan were provided with steam heating boilers. In this case they were “Spanner” boilers, operating at a pressure of 80lbs/sq.in. This latter item contributed a great deal to early diesel types weight, and occupied a not inconsiderable amount of space.

D600 Cab and nose

In an attempt to reduce the overall weight, the cab and nose of the “Warships” was constructed from lightweight aluminium sheet and sections.

Another feature that added greatly to the weight, particularly in this case, was the use of heavy steel fabricated construction techniques. The British Transport Commission’s insistence on using thicker plate than necessary was the principal reason for using these techniques, resulting in a sturdy but unnecessarily heavy structure. This was also the first product from the North British Loco. Co. for the home market, other than shunting types previously built. As such, no doubt there was some experimentation in the design of such a totally new locomotive type to the British railway scene.

External design was left to the manufacturer, and as a result the locomotive types produced under the ‘Pilot Scheme’ all differed in appearance, and unlike the range of ‘Standard’ steam locomotives there was no ‘family likeness’. The D600 series ‘Warships’ were perhaps one of the more attractive designs. The stressed skin framework of the bodysides was punctuated with a honeycomb of grilles, covering the various vents 
and air intake points.

NBL Advert

NBL’s advert in the 1958/59 railway official’s directory, with the D600 series shown in the top sketch.

In addition to the doors providing entry to the driving cabs at either end, windowed access doors were provided
adjacent to the engine compartments, and sections of the roof were made detachable for installation and removal of equipment. The cabs themselves were provided with two large flat windscreens, each having independently operated wipers.

It should be noted here that the majority of diesel types introduced at that time had three windscreens. In fact, apart from the ‘Deltics’, the twin windscreen arrangement was for a long time restricted entirely to the Western Region’s diesel-hydraulics. Another feature peculiar to the ‘Pilot Scheme’ types, was the provision in each nose end of a flexible bellows connection, for use when through passage was required between locomotives when worked in multiple.

Two fans mounted in the roof were arranged to draw cooling air through the twin bank ‘Serck’ radiators mounted just to the rear of each cab. A third grille, positioned mid-way along the roof, served as an engine room vent. The only other apertures were the exhaust outlets, and the output from the ‘Napier’ pressure charger.

Since the train classification headcode panels were not introduced until I962, these “Warships” were provided with train classification discs, and head/tail lamp brackets, as per the then standard steam traction practice. Twin air-operated warning horns were provided in each nose end. Standard side buffers and screw coupling draw-gear were also fitted at each end. Other nose connections were provided for vacuum brake and steam heating pipes, and jumper sockets for control connections when worked in multiple.

Numbering and livery

This series of locomotives, as already mentioned, was ordered from the North British Locomotive Co. at the time of introduction of the re-equipment programme, on I6th November I955. Delivery was due to take place fifteen months after the order was placed, which should have been completed by late I957. As often happened, delays in delivery caused their introduction to be put back to 1958.

A list of numbers, names and building dates is given below:

Numbers & Names

Livery styles for British Railways diesel locomotive Livery
prior to I956 followed basically that scheme applied to the former LMSR diesel-electric units 10000/10001 – black with aluminium lining and raised numerals. Bogie sideframes and sundry details were also picked out in aluminium. Commensurate perhaps with the new era about to begin, all new diesel locomotives were turned out in the new ‘standard’ green livery. This was applied to the nose, body side panels, and that section of the roof extending over each cab and the entrance doors. The roof was medium grey between cantrails. The bogie and underframe details were black, with buffer stocks and the beam itself in the vicinity of the coupling hook picked out in red.   Handrails and the aluminium beadings to the cab windows, windscreens and warning horn mountings were bright polished. Nameplates and the new style B.R. crests were carried on the lower and upper bodysides respectively, and on the same centreline between the engine room access doors on either side. The nameplates themselves were similar to ex GWR locomotive nameplates; cast in brass with raised lettering on a red background.

NRM_D601_Ark_Royal_nameplate

The nameplate of D601 Ark Royal on display at the National Railway Museum. This was the original style, but if a member of the class was painted ‘Rail Blue’, the background was changed to black.            Photo: Geof Sheppard – Own work, CC BY-SA 3.0, https://commons.wikimedia.org/w/index.php?curid=9680512

The scheme of numbering diesel locomotives introduced at this time, including the use of the prefix ‘D’, was developed in order to avoid any confusion which might have arisen using six figure unit numbers. Also it was considered desirable to allocate a block of numbers to individual classes or types, and the problems were thus overcome by use of the ‘D’ prefix. The unit numbers for the D600 series were Gill San transfers applied to the cabsides, under each of the four droplights. Directly under each number, were the North British works plates, and the WR route restriction colour discs, which in this case were single red. They were of course already scrapped when British Rail introduced the TOPS renumbering, which had been first been considered by BR in 1968, following work done in the USA by IBM and the Southern Pacific Railroad. The system was purchased by BR – including the source code – together with an IBM System 360 mainframe computer, and its implementation was supported by Southern Pacific personnel.

Lens of Sutton D600 'Warship'

D600 “Active” on one of the class’s main roles, hauling expresses over the South Devon Banks. A key service for a short time was the “Cornish Riviera Express”.                           Photo: Lens of Sutton/RPBradley Collection

The oddest aspect for the North British Warships was perhaps that they were allocated the new classification – Class 41 – but which was never carried.

In later years, ½ and full height yellow warning panels were applied, which did nothing for their appearance, and the same might be said of the ubiquitous ‘Rail Blue’ livery, and the double arrow symbol seen on D600 whilst awaiting the breakers torch at Barry. Headcode boxes had also been fitted in their mid to late years, since in 1960, the train class, route and reporting number were combined into a single four character display. So, the old style discs were dispensed with and all new locos built after that were fitted with a roller-blind display that could display the full reporting number. Of course this meant for some – such as the North British “Warships” a pair of two character boxes were fitted to either side of the loco front.

Performance


These locomotives were the first 2000hp main line types to be placed in service on the Western Region, and were intended for express Passenger and other top link duties. A demonstration run on Monday I7th February I958 was made by No.D600, hauling a nine coach train from Paddington to Bristol and back. It is interesting to note, in connection with this run, that in order to demonstrate the locomotive’s ability, on the return journey from Bristol, soon after leaving, one of the engines
was shut down, and the remainder of the trip completed on a single engine.

The first regular top link passenger work for the class commenced in June I958, with the ‘Cornish Riviera’ express. Also during this month, a series of comparative tests was made, with the second of the class D60I, and various classes of 4-6-0 steam locomotives. The trials took place between Newton Abbot and Plymouth. It was thought that summer Saturday services in particular would need piloting over this route, and since there would not be enough diesel locomotives available double heading trials were carried out with steam locomotives in order to determine optimum loads and timings over this route. Unfortunately for the North British “Warships”, the D8XX series Swindon “Warships” was appearing in ever increasing numbers.

EPSON scanner image

‘Warship’ Diesel-hydraulic at Reading (General) on an Up express, looking west towards Reading West Junction, Swindon, Bristol, Taunton and the West; ex-Great Western main lines from Paddington. The train, running through on the Up Slow line, is the Summer 08.15 Perranporth – Paddington, headed by 2,000 hp Type 4 A1A-A1A ‘Warship’ No. D600 ‘Active’                                     Photo: Ben Brooksbank, CC BY-SA 2.0, https://commons.wikimedia.org/w/index.php?curid=15149523

This fact, coupled with somewhat varied standards of engine performance, notwithstanding a lack of confidence by maintenance staff in their reliability, gradually forced this class out of the principal duties. The overall performance of the first two, D600-1 was rather better than D602-4. This difference has been attributed largely to the fact that the engines for the first two were actually built in Germany, whereas North British made those for D602-4 under licence. No doubt, there is more than an element of truth in that statement, but perhaps it could also explain the reason for the long gap between the delivery of D600/1, and D602-4.

North_British_Type_4_D601_(8392564224)

A sad end for this pioneering class of diesel locomotives – here D601 “Ark Royal”, and an unidentified sister, are seen at Woodham’s Barry scrapyard in October 1968. The second loco is in rail blue, complete with full yellow ends, and the double arrow symbol, whilst D601 still retains green livery and ½ height warning panels. Both have been transformed with the roller blind headcode boxes stuck to the nose.                                                                 Photo: Hugh Llewelyn – D601Uploaded by Oxyman, CC BY-SA 2.0, https://commons.wikimedia.org/w/index.php?curid=24382933

All five were based for the most part, at Plymouth Laira
 depot, and in their latter years restricted entirely to Cornwall. In 1967 their demise was foreshadowed by the implementation of the National Traction Plan. With this scheme, it was proposed to ‘phase out’ classes of locomotive coming under one of the following three headings:

  1. Elimination of types that had given trouble
  2. Those having excessive maintenance cost
  3. Those classes of low numerical strength

Once again, unfortunately these “Warships” came under all three headings. In 1967 they were transferred to South Wales for a short time, working mineral trains, in place of English Electric type 3’s. This proved to be their final duty, since they were returned to Laira in December 1967 for withdrawal. In July 1968, after being stored for seven months, D600/1 were sold to Woodhams, of Barry and D602-4 to Cashmeres at Newport for scrap.

Sadly, despite its pioneering status, not one of this class of diesel-hydraulic locomotives was rescued for preservation – although the nameplate of D601 “Ark Royal” survives in the NRM at York. But, hydraulic transmission was not a complete failure for BR, since the second “Warship” class locomotives, the Class 42, were very successful, and in turn, they were followed by a final design, the Class 52 “Western” series. But by the time these appeared, the decision to use diesels engines with electric transmission had been made, and these too were to suffer a similar fate to the diesel-hydraulic pioneers.

Useful Links & References

  • “Diesel-Hydraulic Locomotives of the Western Region”;  Brian Reed, pub; David & Charles 1974; ISBN 0715367692
  • “Diesels Western Style”;  Keith Montague; Pub; Oxford Pub. Co. 1974; ISBN 0902888390
  • “Giants of Steam – Story of the North British Locomotive Co.”;  Rodger Bradley; Pub; Oxford Pub. Co., 1995; ISBN; 0860935051

 

-oOo-